Skip to content
In assessmentNo EPBC referral

Mt Lyell Mine New Processing Plant, Queenstown

Waste and recycling · Queenstown · Tasmania

To a 132 kV line
2.4 km

Overview

Copper Mines of Tasmania are proposing the construction of a new processing plant at Mt Lyell Mine, Queenstown. The processing plant will be relocated closer to key infrastructure and use the same process flow as the existing plant. The new plant will be modernised to reduce waste and improve efficiency.

Location
Queenstown (locality centre; the EPA names the locality, not the site), Tasmania-42.0855, 145.5405
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.4 km to a 220 kV line. 7.7 km to John Butters substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 7 Mar 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Mt Lyell Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    7 Mar 2025 → pending1 year 8 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Tasmania’s Next Iconic Walk (NIW)In planning13 km
  2. Newton Pond Leach Residual Storage Facility Expansion, Henty Gold MineIn assessment28 km
  3. Zeehan Zinc Project Stage 2, Tasmanian Smelters Site, ZeehanApproved28 km
  4. Avebury Nickel Mine Waste Rock Sorting Facility, ZeehanIn assessment28 km
  5. Henty Gold Mine ROM Extension, ZeehanApproved28 km
  6. Tenth Legion Mine Western TasmaniaIn planning31 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Invited on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.