Montumana Gravel Quarry, Montumana

Road · Montumana · Tasmania

To a 132 kV line
39 km

Overview

The proponent is proposing to intensify operations at the Montumana Gravel Quarry, located off the Bass Highway, approximately 24 kilometres west of the Wynyard township. The proponent seeks a production increase from 5,000 cubic metres to 20,000 cubic metres per annum.

Location
Montumana (locality centre; the EPA names the locality, not the site), Tasmania-40.9505, 145.4625
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
39 km to a 220 kV line. 39 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 19 Sept 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Montumana Gravel Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    19 Sept 2022 → 7 Nov 20242 years 1 month
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Boys Road Quarry Production Increase, Rocky CapeApproved6 km
  2. Broomhalls Road Quarry Upgrade, Sisters CreekIn assessment7 km
  3. Robbins Island Road to Hampshire Transmission LineIn assessment16 km
  4. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved18 km
  5. Bramich Calder Quarry Intensification, WynyardIn assessment22 km
  6. Wynyard Milk Processing Factory Intensification, WynyardIn assessment22 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-11-07. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.