Skip to content
In assessmentNo EPBC referral

Broomhalls Road Quarry Upgrade, Sisters Creek

Quarries and extractive · Sisters Creek · Tasmania

To a 132 kV line
32 km

Overview

CE and RJ Whitehouse propose to increase extraction and screening of rock at the existing Broomhalls Road Quarry to a maximum of 10,000 cubic metres per year.

Location
Sisters Creek (locality centre; the EPA names the locality, not the site), Tasmania-40.9685, 145.5450
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
32 km to a 220 kV line. 32 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 6 Aug 2020

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 112 Broomhalls Road, Sisters Creek 7325 (Class 2A)Tasmania · Board of the EPA Tasmania
    6 Aug 2020 → pending6 years 3 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Montumana Gravel Quarry, MontumanaApproved7 km
  2. Boys Road Quarry Production Increase, Rocky CapeApproved9 km
  3. Bramich Calder Quarry Intensification, WynyardIn assessment15 km
  4. Wynyard Milk Processing Factory Intensification, WynyardIn assessment15 km
  5. Metal and E-waste Recycling and Processing Facility, WynyardIn assessment15 km
  6. Robbins Island Road to Hampshire Transmission LineIn assessment22 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.