Boys Road Quarry Production Increase, Rocky Cape

Quarries and extractive · Rocky Cape · Tasmania

To a 132 kV line
40 km

Overview

The proposal is to consolidate and increase production on the existing level 1 quarries which operate adjacent to each other on mining leases 5M/2017 and 40M/1990. The proposed maximum production is 40,000 cubic metres of gravel/year and includes extraction, crushing and screening.

Location
Rocky Cape (locality centre; the EPA names the locality, not the site), Tasmania-40.8960, 145.4870
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
40 km to a 220 kV line. 40 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 21 Mar 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Boys Road Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    21 Mar 2022 → 7 July 20264 years 3 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Montumana Gravel Quarry, MontumanaApproved6 km
  2. Broomhalls Road Quarry Upgrade, Sisters CreekIn assessment9 km
  3. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved20 km
  4. Robbins Island Road to Hampshire Transmission LineIn assessment20 km
  5. Bramich Calder Quarry Intensification, WynyardIn assessment23 km
  6. Wynyard Milk Processing Factory Intensification, WynyardIn assessment23 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-07-07. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.