Wynyard Milk Processing Factory Intensification, Wynyard

Manufacturing · Wynyard · Tasmania

To a 132 kV line
17 km

Overview

Fonterra Brands is seeking approval to increase the operating flowrate of the existing milk pasteuriser to a maximum throughput of 600 kilolitres per 8-hour day at the Wynyard Milk Processing Facility located on Inglis Street Wynyard. There are no changes proposed to the existing site operation or operating hours.

Location
Wynyard (locality centre; the EPA names the locality, not the site), Tasmania-41.0170, 145.7080
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
17 km to a 220 kV line. 17 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 28 Aug 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Wynyard Milk POrocessing Factory (Class 2A)Tasmania · Board of the EPA Tasmania
    28 Aug 2026 → pending2 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Bramich Calder Quarry Intensification, WynyardIn assessment0.0 km
  2. Metal and E-waste Recycling and Processing Facility, WynyardIn assessment0.0 km
  3. Broomhalls Road Quarry Upgrade, Sisters CreekIn assessment15 km
  4. Tyre Processing Facility, BurnieIn assessment17 km
  5. HIF Tasmania e-Fuels Facility, BurnieIn assessment17 km
  6. Tasmanian Freight Rail Revitalisation - Tranche 3 – Port of Burnie Shiploader UpgradeUnder construction · $82m17 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.