Bramich Calder Quarry Intensification, Wynyard

Quarries and extractive · Wynyard · Tasmania

To a 132 kV line
17 km

Overview

Bramich Calder Quarry is proposing to intensify existing quarry extraction and processing operations to a maximum production volume of 10,000 cubic metres per annum and undertake crushing of less than 100 tonnes of inert materials per annum.

Location
Wynyard (locality centre; the EPA names the locality, not the site), Tasmania-41.0170, 145.7080
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
17 km to a 220 kV line. 17 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 3 Apr 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Bramich Calder Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    3 Apr 2025 → pending1 year 7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Wynyard Milk Processing Factory Intensification, WynyardIn assessment0.0 km
  2. Metal and E-waste Recycling and Processing Facility, WynyardIn assessment0.0 km
  3. Broomhalls Road Quarry Upgrade, Sisters CreekIn assessment15 km
  4. Tyre Processing Facility, BurnieIn assessment17 km
  5. HIF Tasmania e-Fuels Facility, BurnieIn assessment17 km
  6. Tasmanian Freight Rail Revitalisation - Tranche 3 – Port of Burnie Shiploader UpgradeUnder construction · $82m17 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.