Flowery Gully Quarry Development Project, Beaconsfield

Quarries and extractive · Beaconsfield · Tasmania

To a 132 kV line
5.3 km

Overview

Boral Construction Materials Group Ltd is proposing to expand the existing Flowery Gully Quarry at Flowery Gully Road, Beaconsfield. The proposal is to expand the maximum quarry area laterally, and vertically south of the existing quarry area. There are no proposed changes to the extraction and processing limit of 190,000 cubic metres per annum.

Location
Beaconsfield (locality centre; the EPA names the locality, not the site), Tasmania-41.2215, 146.7825
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
5.3 km to a 220 kV line. 13 km to Comalco substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 12 Jan 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Flowery Gully Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    12 Jan 2024 → pending2 years 10 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Northern Roads PackageUnder construction · $55m12 km
  2. Artec Woodchip Mill Upgrade, Bell BayApproved12 km
  3. Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment12 km
  4. New Woodchip Processing Facility, Bell BayApproved12 km
  5. LBB Biochar Production Facility, Bell BayApproved12 km
  6. High Purity Alumina Pilot Plant, Bell BayApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.