Overview

Southern Marine ShipLift Pty Ltd is proposing to continue periodic dredging of 750 cubic metres of new silt material annually, beneath the ShipLift to maintain shipyard operations as required.

Location
Invermay (locality centre; the EPA names the locality, not the site), Tasmania-41.4210, 147.1325
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.9 km to a 220 kV line. 9.5 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 30 June 2023

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Southern Marine ShipLift (Class 2B)Tasmania · Board of the EPA Tasmania
    30 June 2023 → pending3 years 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Ti Tree Bend Sewerage Treatment Plant Transformation, InvermayIn assessment0.0 km
  2. Hydrovac Waste Recovery Facility, MowbrayIn assessment2 km
  3. Remount Metal Recycling Yard, MowbrayIn assessment2 km
  4. Tyre Shredder, MowbrayIn assessment2 km
  5. Downer EDI Asphalt Plant, MowbrayApproved2 km
  6. 38-Lot SubdivisionIn assessment5 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Closed on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to ports projects in TAS, and the firms you follow, in the Monday briefing.