Skip to content
ApprovedNo EPBC referral

Nook Quarry (Riley), Nook

Quarries and extractive · Nook · Tasmania

To a 132 kV line
1.2 km

Overview

AG & BJ Riley is the Lessee of Mining Lease 25M/2009 and permit holder for the Nook Quarry, which is located at the end of Gravel Pit Road, Nook in Northern Tasmania. Proposal to increase production by extracting 300,000 cubic metres per annum of rock and includes crushing and screening of material.

Location
Nook (locality centre; the EPA names the locality, not the site), Tasmania-41.3360, 146.3350
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.2 km to a 220 kV line. 2.3 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 24 Sept 2019
  3. ApprovedNow
  • EPA assessment, Mining Lease 25M/2009, Gravel Pit Road, Nook 7306 (Class 2B)Tasmania · Board of the EPA Tasmania
    24 Sept 2019 → 9 Nov 20234 years 1 month
    Assessment completed↗
  • EPA assessment, Nook Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    19 Jan 2024 → pending2 years 10 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Alternate Fuels Project, Railton Cement WorksApproved6 km
  2. Dulverton Organics Recycling Facility, RailtonApproved6 km
  3. Remaining North West Transmission Developments for electricity networkIn assessment10 km
  4. Sheffield to Staverton Upgrades: existing electricity transmission line upgradesIn planning11 km
  5. Inert Landfill Area Increase, ForthsideApproved12 km
  6. Landfill Modernisation Project, Dulverton Regional Landfill, LatrobeIn assessment13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.