Overview

The proposal includes a number of changes in the operational aspects of the landfill to build future flexibility and improve ability to service northern Tasmania.

Location
Latrobe (locality centre; the EPA names the locality, not the site), Tasmania-41.2440, 146.4220
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
7.7 km to a 220 kV line. 14 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 16 Sept 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Dulverton Regional Landfill (Class 2B)Tasmania · Board of the EPA Tasmania
    16 Sept 2025 → pending1 year 2 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Latrobe LeveeIn assessment2 km
  2. Sassafras - Wesley Vale Irrigation Scheme AugmentationIn assessment4 km
  3. Hydrogen Tasmania North, Wesley ValeIn assessment6 km
  4. Devonport East Terminal 3 Dredging and Reclaim Project, East DevonportApproved7 km
  5. Squibbs Road Drainage Improvements, Spreyton, TasApproved8 km
  6. Motorcycle Training and Racing TrackIn planning9 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.