Alternate Fuels Project, Railton Cement Works

Other generation · Railton · Tasmania

To a 132 kV line
2 km

Overview

The proponent proposes to upgrade the Railton Cement Works to enable the use of up to 6,000 tonnes per annum (tpa) of Tyre Derived Fuel and 74,000 tpa of biomass fuel within the kiln to reduce the reliance on coal.

Location
Railton (locality centre; the EPA names the locality, not the site), Tasmania-41.3315, 146.4060
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2 km to a 220 kV line. 8.3 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 3 Apr 2025
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Railton Cement Works (Class 2B)Tasmania · Board of the EPA Tasmania
    3 Apr 2025 → 23 Apr 20261 year
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Dulverton Organics Recycling Facility, RailtonApproved0.0 km
  2. Nook Quarry (Riley), NookApproved6 km
  3. Bass Highway targeted upgrades between Deloraine and DevonportIn planning · $50m9 km
  4. Landfill Modernisation Project, Dulverton Regional Landfill, LatrobeIn assessment10 km
  5. Remaining North West Transmission Developments for electricity networkIn assessment11 km
  6. Latrobe LeveeIn assessment11 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-04-23. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to other generation projects in TAS, and the firms you follow, in the Monday briefing.