Mole Creek Limestone Quarry Production Increase, Mole Creek
Quarries and extractive · Mole Creek · Tasmania
- To a 132 kV line
- 10 km
Overview
The Mole Creek Limestone Quarry has been in operation since the early 1970s and produces lime and limestone products for uses including water purification and improving soils. This proposal is to increase the production and crushing limits for the quarry from 180,000 tonnes to 350,000 tonnes of…
- Location
- Mole Creek (locality centre; the EPA names the locality, not the site), Tasmania-41.5615, 146.3405
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 10 km to a 220 kV line. 14 km to Fisher substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 8 Feb 2022
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Mole Creek Limestone Quarry (Class 2B)Tasmania · Board of the EPA Tasmania8 Feb 2022 → pending4 years 9 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Kelly Quarry, Scotts Road, Mole CreekIn assessment0.0 km
- Remaining North West Transmission Developments for electricity networkIn assessment16 km
- Claude Road Abattoir Capacity Increase, Claude RoadApproved16 km
- Cethana Pumped Hydro Energy Storage ProjectIn assessment20 km
- Sheffield to Staverton Upgrades: existing electricity transmission line upgradesIn planning20 km
- Meander Shale Quarry, MeanderApproved22 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.