Michael Kelly is proposing the establishment of a new quarry on Scotts Rd, Mole Creek. This quarry is proposed to produce 20,000 cubic metres of limestone and associated material for agricultural and industrial purposes. The quarry is located approximately 5km south of the town of Mole Creek.

Location
Mole Creek (locality centre; the EPA names the locality, not the site), Tasmania-41.5615, 146.3405
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
10 km to a 220 kV line. 14 km to Fisher substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 9 Feb 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Kelly Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    9 Feb 2024 → pending2 years 9 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Mole Creek Limestone Quarry Production Increase, Mole CreekIn assessment0.0 km
  2. Remaining North West Transmission Developments for electricity networkIn assessment16 km
  3. Claude Road Abattoir Capacity Increase, Claude RoadApproved16 km
  4. Cethana Pumped Hydro Energy Storage ProjectIn assessment20 km
  5. Sheffield to Staverton Upgrades: existing electricity transmission line upgradesIn planning20 km
  6. Meander Shale Quarry, MeanderApproved22 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.