Skip to content
ApprovedNo EPBC referral

Claude Road Abattoir Capacity Increase, Claude Road

Manufacturing · Claude Road · Tasmania

To a 132 kV line
2.6 km

Overview

The Local Meat Co Pty Ltd is seeking approval to increase throughput of the existing Claude Road Abattoir from up to 100 tonnes to 500 tonnes per annum.

Location
Claude Road (locality centre; the EPA names the locality, not the site), Tasmania-41.4350, 146.2540
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.6 km to a 220 kV line. 11 km to Cethana substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 1 Feb 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Claude Road Abattoir (Class 2A)Tasmania · Board of the EPA Tasmania
    1 Feb 2023 → 9 July 20263 years 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Sheffield to Staverton Upgrades: existing electricity transmission line upgradesIn planning4 km
  2. Remaining North West Transmission Developments for electricity networkIn assessment9 km
  3. Nook Quarry (Riley), NookApproved13 km
  4. Kelly Quarry, Scotts Road, Mole CreekIn assessment16 km
  5. Mole Creek Limestone Quarry Production Increase, Mole CreekIn assessment16 km
  6. Cethana Pumped Hydro Energy Storage ProjectIn assessment16 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-07-09. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.