ApprovedNo EPBC referral

Asphalt and Reclaimed Asphalt Pavement Processing Plant, Bridgewater

Manufacturing · Bridgewater · Tasmania

To a 132 kV line
0.1 km

Overview

Hazell Bros Group Pty Ltd are proposing to construct and operate a new asphalt and reclaimed asphalt pavement (RAP) processing plant within an industrial area of Bridgewater, producing a maximum of 50,000 tonnes per annum (tpa) of asphalt and receiving and processing up to 5,000 tpa of reclaimed asphalt pavement.

Location
Bridgewater (locality centre; the EPA names the locality, not the site), Tasmania-42.7220, 147.2280
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.1 km to a 220 kV line. 14 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 31 May 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant (Class 2B)Tasmania · Board of the EPA Tasmania
    31 May 2024 → 17 Mar 20261 year 9 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Metal Recycling Facility, BridgewaterApproved0.0 km
  2. Tyre Recycling Facility Upgrade, BridgewaterApproved0.0 km
  3. Boral Bridgewater Quarry, Material Recycling Facility, BridgewaterIn assessment0.0 km
  4. Bullock Recycling Services Relocation, BridgewaterIn assessment0.0 km
  5. Hydrogen Hub, BrightonIn assessment2 km
  6. New Bridgewater BridgeUnder construction · $786m3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-03-17. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.