In assessmentNo EPBC referral

Maxxis Quarry, Randalls Bay

Quarries and extractive · Randalls Bay · Tasmania

To a 132 kV line
44 km

Overview

Kelly Brothers are proposing to upgrade a current level 1 activity, operating under existing use rights with a production limit of 5000 cubic metres, to allow extraction and processing, by crushing and screening, of up to 20,000 cubic metres per annum.

Location
Randalls Bay (locality centre; the EPA names the locality, not the site), Tasmania-43.2355, 147.1275
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
44 km to a 220 kV line. 45 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 1 July 2016

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 110 Randalls Bay Road, Randalls Bay 7112 (Class 2B)Tasmania · Board of the EPA Tasmania
    1 July 2016 → pending10 years 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Artificial Reef in Great Bay, D'Entrecasteaux ChannelApproved10 km
  2. Reef Builder Southeast Tasmania, D'Entrecasteaux ChannelApproved10 km
  3. Stanmore Quarry Capacity Increase, Huon Highway, DoverIn assessment12 km
  4. Fish Processing Facility Upgrade, DoverApproved12 km
  5. Cygnet Wastewater Treatment Plant, Discharge Relocation, Port CygnetApproved12 km
  6. Wooreddy Road Quarry, Bruny IslandIn assessment13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Closed on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.