Skip to content
In assessmentNo EPBC referral

Wooreddy Road Quarry, Bruny Island

Quarries and extractive · Alonnah · Tasmania

To a 132 kV line
51 km

Overview

Kenneth and Karen Marsh are proposing to intensify operations at the Wooreddy Road quarry, located in southern Bruny Island. The proposal involves a production increase from 1,000 cubic metres to 5,000 cubic metres of rock and gravel per year with 2,500 cubic metres to be crushed and/or screened.

Location
Alonnah (locality centre; the EPA names the locality, not the site), Tasmania-43.3055, 147.2495
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
51 km to a 220 kV line. 51 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 12 Jan 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Wooreddy Road QuarryTasmania · Board of the EPA Tasmania
    12 Jan 2024 → pending2 years 10 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Musketts Road Quarry Expansion, Bruny Island Main Road, AlonnahIn assessment0.0 km
  2. Maxxis Quarry, Randalls BayIn assessment13 km
  3. Artificial Reef in Great Bay, D'Entrecasteaux ChannelApproved16 km
  4. Reef Builder Southeast Tasmania, D'Entrecasteaux ChannelApproved16 km
  5. Stanmore Quarry Capacity Increase, Huon Highway, DoverIn assessment19 km
  6. Fish Processing Facility Upgrade, DoverApproved19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.