Skip to content
ApprovedNo EPBC referral

Cygnet Wastewater Treatment Plant, Discharge Relocation, Port Cygnet

Water and wastewater · Cygnet · Tasmania

To a 132 kV line
33 km

Overview

The proposal is to relocate the outfall (discharge) of the existing Cygnet Wastewater Treatment Plant from its current location on the foreshore above the high water mark to deeper water off Crooked Tree Point within Port Cygnet Bay.

Location
Cygnet (locality centre; the EPA names the locality, not the site), Tasmania-43.1270, 147.0870
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
33 km to a 220 kV line. 34 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 16 Oct 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Cygnet Wastewater Treatment Plant, Channel Highway, Cygnet 7112 (Class 2B)Tasmania · Board of the EPA Tasmania
    16 Oct 2020 → 22 Nov 20211 year 1 month
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Catos Hill Quarry Capacity Increase, CradocApproved5 km
  2. Geeveston Wastewater Treatment Plant, Discharge Relocation, Port HuonApproved11 km
  3. Whale Point Nursery Intensification and Expansion, Port HuonApproved11 km
  4. Sawmill and Pyrolysis Facility, HuonvilleApproved11 km
  5. Artificial Reef in Great Bay, D'Entrecasteaux ChannelApproved11 km
  6. Reef Builder Southeast Tasmania, D'Entrecasteaux ChannelApproved11 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2021-11-22. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.