Skip to content
In assessmentNo EPBC referral

East Arm Pine Bark Processing Facility, Hillwood

Manufacturing · Hillwood · Tasmania

To a 132 kV line
3.2 km

Overview

Padgetts Pinebark Pty Ltd propose to operate a pine bark processing and storage facility that will receive, process, and stockpile approximately 60,000 cubic metres of pine bark per annum.

Location
Hillwood (locality centre; the EPA names the locality, not the site), Tasmania-41.2165, 146.9655
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3.2 km to a 220 kV line. 12 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 17 Nov 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, East Arm Pinebark Processing Facility (Class 2A)Tasmania · Board of the EPA Tasmania
    17 Nov 2022 → pending4 years so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. East Arm Road Quarry, HillwoodApproved0.0 km
  2. Northern Roads PackageUnder construction · $55m5 km
  3. Aggregate Processing Facility, Long ReachIn assessment6 km
  4. Artec Woodchip Mill Upgrade, Bell BayApproved12 km
  5. Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment12 km
  6. New Woodchip Processing Facility, Bell BayApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.