Skip to content
In assessmentNo EPBC referral

Aggregate Processing Facility, Long Reach

Transmission · Long Reach · Tasmania

To a 132 kV line
0.7 km

Overview

East Arm Resources Pty Ltd proposes to build and operate an Aggregate Processing Facility (APF) to receive and process into aggregates the rock extracted from the East Arm Road Quarry. The APF includes crushers and screens, conveyors, loaders, hoppers and associated infrastructure (hardstand, powerline, power substation, sediment and drainage systems and ponds, water tank). The proposal also includes a haul road and bridge over Fourteen Mile Creek.

Location
Long Reach (locality centre; the EPA names the locality, not the site), Tasmania-41.1660, 146.9560
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.7 km to a 220 kV line. 7.2 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 22 Apr 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, East Arm Resources Aggregate Processing Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    22 Apr 2024 → pending2 years 7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Northern Roads PackageUnder construction · $55m5 km
  2. East Arm Pine Bark Processing Facility, HillwoodIn assessment6 km
  3. East Arm Road Quarry, HillwoodApproved6 km
  4. Artec Woodchip Mill Upgrade, Bell BayApproved8 km
  5. Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment8 km
  6. New Woodchip Processing Facility, Bell BayApproved8 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to transmission projects in TAS, and the firms you follow, in the Monday briefing.