Skip to content
ApprovedNo EPBC referral

Geeveston Wastewater Treatment Plant, Discharge Relocation, Port Huon

Water and wastewater · Port Huon · Tasmania

To a 132 kV line
37 km

Overview

TasWater proposes to construct and operate a new treated effluent pump station, pipeline and outfall for the Geeveston Wastewater Treatment Plant relocating the discharge from the Kermandie River to the Huon River at Shipwrights Point.

Location
Port Huon (locality centre; the EPA names the locality, not the site), Tasmania-43.1490, 146.9600
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
37 km to a 220 kV line. 42 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 21 Oct 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Geeveston Wastewater Treatment Plant and Shipwrights Point, Port Huon 7116 (Class 2B)Tasmania · Board of the EPA Tasmania
    21 Oct 2020 → 30 Nov 20211 year 1 month
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Whale Point Nursery Intensification and Expansion, Port HuonApproved0.0 km
  2. Catos Hill Quarry Capacity Increase, CradocApproved7 km
  3. Cygnet Wastewater Treatment Plant, Discharge Relocation, Port CygnetApproved11 km
  4. Sawmill and Pyrolysis Facility, HuonvilleApproved15 km
  5. Maxxis Quarry, Randalls BayIn assessment17 km
  6. Stanmore Quarry Capacity Increase, Huon Highway, DoverIn assessment17 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2021-11-30. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.