South Arm Pipeline, Class A Water Treatment Plant, Blackmans Bay

Water and wastewater · Blackmans Bay · Tasmania

To a 132 kV line
20 km

Overview

Proposal to construct and operate a plant to treat Class B effluent from Blackmans Bay STP to Class A effluent for use in an effluent reuse scheme at South Arm Recreational area. The EER covers the construction and operation of the plant and the application of re-use water for the South Arm recreational area.

Location
Blackmans Bay (locality centre; the EPA names the locality, not the site), Tasmania-43.0120, 147.3185
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
20 km to a 220 kV line. 19 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 22 July 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Blackmans Bay Wastewater Treatment Plant, 112 Tinderbox Road, Blackmans Bay 7052 (Class 2B)Tasmania · Board of the EPA Tasmania
    22 July 2020 → 20 Feb 20243 years 6 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Huntingfield Master Plan – Stage 2 and 3Approved3 km
  2. Kingston Bypass Stage 2 and Algona Road UpgradesIn assessment4 km
  3. Algona Road Grade Separated Interchange and Duplication of the Kingston BypassIn planning · $76m4 km
  4. Fish Ensilage Facility, ElectronaIn assessment7 km
  5. H.B.M.I. Leslie Vale Quarry - capacity increaseIn assessment7 km
  6. Margate Fish Processing Facility, MargateIn assessment8 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-02-20. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.