Fish Ensilage Facility, Electrona

Waste and recycling · Electrona · Tasmania

To a 132 kV line
23 km

Overview

The proposal is for the continued operation of a fish ensilage facility to process up to 144 tonnes of fish mortalities per day (52,560 Tonners per annum). The facility is located within the Electrona Industrial precint. The ensilage facility will receive fish mortalities from Huon Aquaculture Company’s aquaculture leases located within Storm Bay. The ensilage facility will process these fish mortalities into a liquid product that is then transported to a facility approved to receive fish waste.

Location
Electrona (locality centre; the EPA names the locality, not the site), Tasmania-43.0500, 147.2565
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
23 km to a 220 kV line. 23 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 12 June 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Electrona Ensilage Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    12 June 2024 → pending2 years 5 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Margate Fish Processing Facility, MargateIn assessment4 km
  2. Huntingfield Master Plan – Stage 2 and 3Approved6 km
  3. South Arm Pipeline, Class A Water Treatment Plant, Blackmans BayApproved7 km
  4. H.B.M.I. Leslie Vale Quarry - capacity increaseIn assessment8 km
  5. Kingston Bypass Stage 2 and Algona Road UpgradesIn assessment8 km
  6. Concrete Batch Plant, Leslie ValeIn assessment9 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.