Margate Fish Processing Facility, Margate

Water and wastewater · Margate · Tasmania

Changed 22 November 2026: State approval: In assessment to Withdrawn. All changes

To a 132 kV line
20 km

Overview

To improve efficiency across Tassal’s Tasmanian operations, it is proposed to consolidate all filleting operations at the Margate processing facility. Tassal is seeking to increase the production volume of the facility from 4000 t/y to 20,000 t/y saleable product. A variety of infrastructure upgrades will be required to achieve the proposed volume increase. Works include extending existing factory buildings, upgrading the wastewater treatment plant, expanding the car park and managing increased volumes of solid wastes.

Location
Margate (locality centre; the EPA names the locality, not the site), Tasmania-43.0235, 147.2255
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
20 km to a 220 kV line. 20 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentNowLodged 13 Oct 2020
  • EPA assessment, 10-16 Marina Drive, Baretta 7054 (Class 2B)Tasmania · Board of the EPA Tasmania
    13 Oct 2020 → pending6 years 1 month so far
    In assessment↗
  • EPA assessment, Margate Processing Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    28 Mar 2023 → date not published
    Withdrawn↗

Recent changes

Recorded since October 2026 · RSS feed
  1. State approval: In assessment to Withdrawn.Approval

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Fish Ensilage Facility, ElectronaIn assessment4 km
  2. H.B.M.I. Leslie Vale Quarry - capacity increaseIn assessment5 km
  3. Concrete Batch Plant, Leslie ValeIn assessment5 km
  4. Huntingfield Master Plan – Stage 2 and 3Approved6 km
  5. Kingston Bypass Stage 2 and Algona Road UpgradesIn assessment8 km
  6. South Arm Pipeline, Class A Water Treatment Plant, Blackmans BayApproved8 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Withdrawn. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.