Skip to content
ApprovedNo EPBC referral

Smithton Abattoir and Rendering, Smithton

Road · Smithton · Tasmania

To a 132 kV line
69 km

Overview

Greenham Tasmania Pty Ltd is proposing to construct replacement operational facilities and demolish redundant infrastructure at the Smithton Abattoir, located off the Bass Highway, approximately 1.5km south of Smithton. There is no change in production volumes proposed.

Location
Smithton (locality centre; the EPA names the locality, not the site), Tasmania-40.8405, 145.1365
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
69 km to a 220 kV line. 69 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

3 approvals on record
  1. Planning
  2. AssessmentLodged 23 July 2019
  3. ApprovedNow
  • EPA assessment, 2 Bacon Factory Road, Smithton 7330 (Class 2A)Tasmania · Board of the EPA Tasmania
    23 July 2019 → 22 Apr 20208 months
    Assessment completed↗
  • EPA assessment, 4 Bacon Factory Road, Smithton 7330 (Class 2A)Tasmania · Board of the EPA Tasmania
    20 Mar 2023 → 18 July 20233 months
    Assessment completed↗
  • EPA assessment, Smithton Abattoir (Class 2A)Tasmania · Board of the EPA Tasmania
    14 Mar 2025 → pending1 year 8 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Purdys Road Lardner Quarry, SmithtonIn assessment0.0 km
  2. Purdys Road Quarry Expansion, SmithtonApproved0.0 km
  3. Beacom Hills Quarry, Irishtown Road, SmithtonIn assessment0.0 km
  4. Bass Highway – Marrawah to Wynyard UpgradeUnder construction · $100m8 km
  5. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved15 km
  6. Woolnorth Wind Farm RepoweringIn assessment20 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Closed on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.