Skip to content
In assessmentNo EPBC referral

Beacom Hills Quarry, Irishtown Road, Smithton

Quarries and extractive · Smithton · Tasmania

To a 132 kV line
69 km

Overview

The development application is seeking approval for the addition of materials handling (crushing and screening ) of up to 5,000 cubic metres/year to an existing quarry currently authorised to extract up to 6,000 cubic metres gravel or rock. The application also seeks to increase the land area of the quarry to include whole area under Certificate of Title 170402/1.

Location
Smithton (locality centre; the EPA names the locality, not the site), Tasmania-40.8405, 145.1365
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
69 km to a 220 kV line. 69 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 31 May 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Beacom Hills Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    31 May 2022 → pending4 years 5 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Purdys Road Lardner Quarry, SmithtonIn assessment0.0 km
  2. Purdys Road Quarry Expansion, SmithtonApproved0.0 km
  3. Smithton Abattoir and Rendering, SmithtonApproved0.0 km
  4. Bass Highway – Marrawah to Wynyard UpgradeUnder construction · $100m8 km
  5. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved15 km
  6. Woolnorth Wind Farm RepoweringIn assessment20 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.