Purdys Road Quarry Expansion, Smithton

Quarries and extractive · Smithton · Tasmania

To a 132 kV line
69 km

Overview

Allan Lord Holdings Pty Ltd is proposing to expand the footprint of its Purdys Road Quarry, allowing the life of the quarry to be extended. The quarry is currently regulated as a Level 2 quarry by the EPA. The site is located at Purdys Road approximately 5 kms south-east of Smithton and within mining lease 1398P/M. An application has been lodged for an additional mining lease 2144P/M to cover the proposed expansion area.

Location
Smithton (locality centre; the EPA names the locality, not the site), Tasmania-40.8405, 145.1365
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
69 km to a 220 kV line. 69 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 2 Oct 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Purdys Road QuarryTasmania · Board of the EPA Tasmania
    2 Oct 2023 → 30 June 20262 years 8 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Purdys Road Lardner Quarry, SmithtonIn assessment0.0 km
  2. Smithton Abattoir and Rendering, SmithtonApproved0.0 km
  3. Beacom Hills Quarry, Irishtown Road, SmithtonIn assessment0.0 km
  4. Bass Highway – Marrawah to Wynyard UpgradeUnder construction · $100m8 km
  5. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved15 km
  6. Woolnorth Wind Farm RepoweringIn assessment20 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-06-30. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.