Skip to content
ApprovedNo EPBC referral

Devonport East Terminal 3 Dredging and Reclaim Project, East Devonport

Ports · East Devonport · Tasmania

To a 132 kV line
14 km

Overview

The proposal is for dredging material from the Berth 3 East pocket at the Port of Devonport and construction of a reclaim area to accomodate new multilevel roll on roll off ship ramps.

Location
East Devonport (locality centre; the EPA names the locality, not the site), Tasmania-41.1870, 146.4000
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
14 km to a 220 kV line. 18 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 26 June 2019
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Port of Devonport, East Terminal 3 (Class 2B)Tasmania · Board of the EPA Tasmania
    26 June 2019 → 3 May 20222 years 10 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hydrogen Tasmania North, Wesley ValeIn assessment2 km
  2. Simplot Vegetable Processing Facility Upgrade, DevonportApproved5 km
  3. Latrobe LeveeIn assessment5 km
  4. Motorcycle Training and Racing TrackIn planning5 km
  5. Squibbs Road Drainage Improvements, Spreyton, TasApproved6 km
  6. Landfill Modernisation Project, Dulverton Regional Landfill, LatrobeIn assessment7 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-05-03. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to ports projects in TAS, and the firms you follow, in the Monday briefing.