Skip to content
ApprovedNo EPBC referral

Savage River Mine North Pit Underground, Savage River

Mining · Savage River · Tasmania

To a 132 kV line
25 km

Overview

Grange Resources (Tasmania) Pty Ltd is proposing to develop an underground mine below North Pit at Savage River Mine. The mine will be conducted in two stages, the first a trial mine developed using sub-level caving methods, followed by a main underground stage involving block cave mining.

Location
Savage River (locality centre; the EPA names the locality, not the site), Tasmania-41.4820, 145.2275
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
25 km to a 220 kV line. 28 km to Pieman substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 3 Mar 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Savage River Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    3 Mar 2020 → 13 Aug 20244 years 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Savage River Mine Centre Pit, Savage RiverApproved0.0 km
  2. Livingstone DSO Hematite Mine ProjectIn planning24 km
  3. Whaleback Ridge Renewable Energy ProjectIn assessment34 km
  4. Renison Tailings Retreatment Project (Rentails Project)In assessment38 km
  5. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved38 km
  6. Paste Backfill Plant, Renison Bell Mine, Renison BellApproved38 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-08-13. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.