Overview

Grange Resources (Tasmania) Pty Ltd propose to dewater and recommence mining in Centre Pit North and Centre Pit South, and merge them into one combined pit, referred to as Centre Pit.

Location
Savage River (locality centre; the EPA names the locality, not the site), Tasmania-41.4820, 145.2275
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
25 km to a 220 kV line. 28 km to Pieman substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 29 Sept 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Savage River Mine, Savage River 7320 (Class 2B)Tasmania · Board of the EPA Tasmania
    29 Sept 2021 → 5 Apr 20226 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Savage River Mine North Pit Underground, Savage RiverApproved0.0 km
  2. Livingstone DSO Hematite Mine ProjectIn planning24 km
  3. Whaleback Ridge Renewable Energy ProjectIn assessment34 km
  4. Renison Tailings Retreatment Project (Rentails Project)In assessment38 km
  5. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved38 km
  6. Paste Backfill Plant, Renison Bell Mine, Renison BellApproved38 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-04-05. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.