Saltwood Sand Recovery Project, Bridport

Quarries and extractive · Bridport · Tasmania

Changed 22 November 2026: State approval: In assessment to Withdrawn. All changes

To a 132 kV line
40 km

Overview

The proposal is to recommence and intensify operations at the Saltwood Sand Recovery Project, with extraction limits of 150 000 metres cube per annum proposed. Raw sand is to be extracted from the dune facies, where it will be transported to a storage and screening area via internal access roads. The proposal is located approximately six kilometres east of Bellingham and nine kilometres west of Bridport.

Location
Bridport (locality centre; the EPA names the locality, not the site), Tasmania-41.0270, 147.3960
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
40 km to a 220 kV line. 43 km to Georgetown Convertor substation (400 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentNowLodged 9 Mar 2023
  • EPA assessment, Saltwood Road Sand Recovery Project (Class 2B)Tasmania · Board of the EPA Tasmania
    9 Mar 2023 → date not published
    Withdrawn↗
  • EPA assessment, Saltwood Sand Recovery Project (Class 2B)Tasmania · Board of the EPA Tasmania
    28 Aug 2024 → pending2 years 2 months so far
    In assessment↗

Recent changes

Recorded since October 2026 · RSS feed
  1. State approval: In assessment to Withdrawn.Approval

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Scottsdale Irrigation Scheme (SIS) - TasmaniaApproved18 km
  2. Vox Resources Tyre Processing, ScottsdaleIn assessment20 km
  3. Tasman Highway Sideling UpgradeUnder construction · $50m22 km
  4. Springfield Abattoir Production Increase, SpringfieldIn assessment26 km
  5. Sykes Quarry Expansion, SpringfieldIn assessment26 km
  6. Branxholm Sawmill Intensification, BranxholmApproved33 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.