Skip to content
In assessmentNo EPBC referral

Sykes Quarry Expansion, Springfield

Quarries and extractive · Springfield · Tasmania

To a 132 kV line
37 km

Overview

The proposal is for the expansion of the maximum extraction area for an existing level 2 quarry and the upgrade and intensification of use of an existing access off Ten Mile Track. The existing extraction (20,000 m3) and processing volumes (18,000 m3) will remain unchanged.

Location
Springfield (locality centre; the EPA names the locality, not the site), Tasmania-41.2555, 147.4775
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
37 km to a 220 kV line. 42 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 27 June 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Sykes Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    27 June 2025 → pending1 year 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Springfield Abattoir Production Increase, SpringfieldIn assessment0.0 km
  2. Tasman Highway Sideling UpgradeUnder construction · $50m5 km
  3. Vox Resources Tyre Processing, ScottsdaleIn assessment11 km
  4. Scottsdale Irrigation Scheme (SIS) - TasmaniaApproved13 km
  5. Branxholm Sawmill Intensification, BranxholmApproved23 km
  6. Underwood Quarry Intensification, UnderwoodIn assessment24 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.