Springfield Abattoir Production Increase, Springfield

Manufacturing · Springfield · Tasmania

To a 132 kV line
37 km

Overview

Springfield Meat Company Pty Ltd is seeking to increase the production capacity of its abattoir at 349 Ten Mile Track, Scottsdale to 4,000 tonnes per annum (tpa) of meat products. The existing Permit Conditions – Environmental No. 10214 has a production limit of 2,000 tpa of meat products. According to the proponent, the production increase will be incremental over several years and no major facility upgrades are required.

Location
Springfield (locality centre; the EPA names the locality, not the site), Tasmania-41.2555, 147.4775
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
37 km to a 220 kV line. 42 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 23 May 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Springfield Abattoir (Class 2B)Tasmania · Board of the EPA Tasmania
    23 May 2025 → pending1 year 6 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Sykes Quarry Expansion, SpringfieldIn assessment0.0 km
  2. Tasman Highway Sideling UpgradeUnder construction · $50m5 km
  3. Vox Resources Tyre Processing, ScottsdaleIn assessment11 km
  4. Scottsdale Irrigation Scheme (SIS) - TasmaniaApproved13 km
  5. Branxholm Sawmill Intensification, BranxholmApproved23 km
  6. Underwood Quarry Intensification, UnderwoodIn assessment24 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.