In assessmentNo EPBC referral

Reverse Osmosis Facility, Nubeena

Water and wastewater · Nubeena · Tasmania

To a 132 kV line
43 km

Overview

Tassal Operations Pty Ltd proposes to continue operating the reverse osmosis plant at the Nubeena shore base. The plant produces approximately 1.3 mega litres per day of freshwater that is stored prior to use, and generates up to 1.5 ML/day of brine wastewater that is discharged to Badger Cove in accordance with the existing Wastewater Discharge Management Plan.

Location
Nubeena (locality centre; the EPA names the locality, not the site), Tasmania-43.1000, 147.7120
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
43 km to a 220 kV line. 42 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 28 Sept 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Reverse Osmosis Facility (Class 2A)Tasmania · Board of the EPA Tasmania
    28 Sept 2026 → pending1 month so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Nichols Road Quarry Intensification, NubeenaIn assessment0.0 km
  2. Noyes Road Quarry Capacity Increase, White BeachIn assessment5 km
  3. White Beach Quarry Capacity Increase, White BeachApproved5 km
  4. Penitentiary Conservation Project, Port Arthur Historic SiteIn planning12 km
  5. Sandford Sand Mine and Washing Facility, Expansion and IntensificationIn assessment21 km
  6. Rokeby Road - South Arm Road Upgrades: Acton Road Intersection UpgradeIn planning · $55m29 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.