Skip to content
Reverse Osmosis Facility, Nubeena
Water and wastewater · Nubeena · Tasmania
- To a 132 kV line
- 43 km
Overview
Tassal Operations Pty Ltd proposes to continue operating the reverse osmosis plant at the Nubeena shore base. The plant produces approximately 1.3 mega litres per day of freshwater that is stored prior to use, and generates up to 1.5 ML/day of brine wastewater that is discharged to Badger Cove in accordance with the existing Wastewater Discharge Management Plan.
- Location
- Nubeena (locality centre; the EPA names the locality, not the site), Tasmania-43.1000, 147.7120
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 43 km to a 220 kV line. 42 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 28 Sept 2026
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Reverse Osmosis Facility (Class 2A)Tasmania · Board of the EPA Tasmania28 Sept 2026 → pending1 month so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Nichols Road Quarry Intensification, NubeenaIn assessment0.0 km
- Noyes Road Quarry Capacity Increase, White BeachIn assessment5 km
- White Beach Quarry Capacity Increase, White BeachApproved5 km
- Penitentiary Conservation Project, Port Arthur Historic SiteIn planning12 km
- Sandford Sand Mine and Washing Facility, Expansion and IntensificationIn assessment21 km
- Rokeby Road - South Arm Road Upgrades: Acton Road Intersection UpgradeIn planning · $55m29 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.