Sandford Sand Mine and Washing Facility, Expansion and Intensification

Quarries and extractive · Sandford · Tasmania

To a 132 kV line
22 km

Overview

Lazenby Sand Pty Ltd is proposing to expand and intensify its existing operations at the Sandford Sand Mine and Washing Facility, located off South Arm Road, approximately 2.5 kilometres north-west of Clifton Beach

Location
Sandford (locality centre; the EPA names the locality, not the site), Tasmania-42.9785, 147.5100
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
22 km to a 220 kV line. 22 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 21 June 2023

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Sandford Sand Mine and Washing Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    21 June 2023 → pending3 years 5 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Rokeby Road - South Arm Road Upgrades: Acton Road Intersection UpgradeIn planning · $55m9 km
  2. Bellerive Beach Stormwater Outfall UpgradeIn planning15 km
  3. South Arm Pipeline, Class A Water Treatment Plant, Blackmans BayApproved16 km
  4. Expansion and Upgrade of Hydrowater Treatment Facility, MorningtonApproved16 km
  5. Sandy Bay Ferry TerminalIn planning16 km
  6. Mornington Roundabout UpgradeIn planning · $100m16 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.