Port of Hastings Hydrogen Production Facility

Hydrogen · Mornington Peninsula · Victoria

To a 132 kV line
23 km

Overview

The amendment facilitates the use and development of a hydrogen production facility (Industry) that is to operate in conjunction with the existing hydrogen liquefaction facility at the Port of Hastings. The Amendment applies the Specific Controls Overlay, Schedule 13 (SCO13) and amends the existing Incorporated Document.

Location
Mornington Peninsula (council area centre; the amendment names the council, not the site), Victoria-38.3325, 144.9530
Value
Not published
Approving authority
Victorian Minister for Planning
Distance to the grid
23 km to a 220 kV line. 23 km to Tyabb substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNowApproved 2 July 2025

Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Planning scheme amendment (Mornington Peninsula)Victoria · Victorian Minister for Planning · C304morn
    Lodged, date not published → 2 July 2025
    Approved↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Long Island Point Energy Generation Facility, HastingsApproved0.0 km
  2. Proposed residential subdivision and development of 62 Collins Road and 170 Boundary Road DromanaApproved3 km
  3. Boundary Road Quarry extension, Dromana, VicIn assessment4 km
  4. Mornington BESSIn planning23 km
  5. 2025 Victorian Renewable Energy TerminalIn assessment23 km
  6. Victorian Renewable Energy TerminalIn planning24 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Victorian planning scheme amendments, Department of Transport and PlanningAmendment C304morn: Finished, approved, decided 2025-07-02, gazetted 2025-07-11. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to hydrogen projects in VIC, and the firms you follow, in the Monday briefing.