Mornington BESS

Batteries and pumped hydro · Tyabb · Victoria

Capacity
240 MW
To a 132 kV line
0.4 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 240 MW (2 hour) battery.

Location
Tyabb (town centre; the tender results do not give the site), Victoria-38.2663, 145.1974
Value
Not published
Technology
Battery, 240 MW, with 587 MWh of storage
Distance to the grid
0.4 km to a 220 kV line. 0.4 km to Tyabb substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 240 MW, 587 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. 2025 Victorian Renewable Energy TerminalIn assessment4 km
  2. Victorian Renewable Energy TerminalIn planning5 km
  3. Building a world class hospital for Frankston familiesUnder construction · $1.1bn14 km
  4. Lathams Road Upgrade, Carrum DownsApproved14 km
  5. Residential development, 40-46 Cyril Beechey Lane, Cranbourne, VicApproved18 km
  6. Cranbourne West Commercial and Industrial DevelopmentIn planning19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.