Long Island Point Energy Generation Facility, Hastings
Transmission · Mornington Peninsula · Victoria
- To a 132 kV line
- 23 km
Overview
To introduce an incorporated document and Specific Controls Overlay (SCO) to land generally at Esso's Long Island Point Fractionation Plant and several road reserves in Hastings to facilitate the use and development of an energy generation facility, utility installation (powerline) and the removal of native vegetation.
- Location
- Mornington Peninsula (council area centre; the amendment names the council, not the site), Victoria-38.3325, 144.9530
- Value
- Not published
- Approving authority
- Victorian Minister for Planning
- Distance to the grid
- 23 km to a 220 kV line. 23 km to Tyabb substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- Assessment
- ApprovedNowApproved 24 Mar 2023
- Construction
- Operating
Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- Planning scheme amendment (Mornington Peninsula)Victoria · Victorian Minister for Planning · C297mornLodged, date not published → 24 Mar 2023Approved↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
This project runs along a route but is mapped at one point on it, so the screen covers that point only.
Nearby
- Port of Hastings Hydrogen Production FacilityApproved0.0 km
- Proposed residential subdivision and development of 62 Collins Road and 170 Boundary Road DromanaApproved3 km
- Boundary Road Quarry extension, Dromana, VicIn assessment4 km
- Mornington BESSIn planning23 km
- 2025 Victorian Renewable Energy TerminalIn assessment23 km
- Victorian Renewable Energy TerminalIn planning24 km
Sources
- Victorian planning scheme amendments, Department of Transport and PlanningAmendment C297morn: Draft, approved, decided 2023-03-24, gazetted 2023-03-24. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to transmission projects in VIC, and the firms you follow, in the Monday briefing.