ApprovedC297morn · No EPBC referral

Long Island Point Energy Generation Facility, Hastings

Transmission · Mornington Peninsula · Victoria

To a 132 kV line
23 km

Overview

To introduce an incorporated document and Specific Controls Overlay (SCO) to land generally at Esso's Long Island Point Fractionation Plant and several road reserves in Hastings to facilitate the use and development of an energy generation facility, utility installation (powerline) and the removal of native vegetation.

Location
Mornington Peninsula (council area centre; the amendment names the council, not the site), Victoria-38.3325, 144.9530
Value
Not published
Approving authority
Victorian Minister for Planning
Distance to the grid
23 km to a 220 kV line. 23 km to Tyabb substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNowApproved 24 Mar 2023

Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Planning scheme amendment (Mornington Peninsula)Victoria · Victorian Minister for Planning · C297morn
    Lodged, date not published → 24 Mar 2023
    Approved↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and VIC maps…
  1. Port of Hastings Hydrogen Production FacilityApproved0.0 km
  2. Proposed residential subdivision and development of 62 Collins Road and 170 Boundary Road DromanaApproved3 km
  3. Boundary Road Quarry extension, Dromana, VicIn assessment4 km
  4. Mornington BESSIn planning23 km
  5. 2025 Victorian Renewable Energy TerminalIn assessment23 km
  6. Victorian Renewable Energy TerminalIn planning24 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Victorian planning scheme amendments, Department of Transport and PlanningAmendment C297morn: Draft, approved, decided 2023-03-24, gazetted 2023-03-24. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.