Parramatta Creek Fish Processing Facility, Sassafras

Manufacturing · Sassafras · Tasmania

To a 132 kV line
1 km

Overview

Huon Aquaculture Company Pty Ltd is currently operating under approval (EPA file reference 244900) as a fish processing facility located approximately 25 km southeast of Devonport. The proposal seeks to increase the current approved annual production of 33,000 tonnes per annum of head-on-gutted (HOG) fish products to 48,000 tonnes per annum of HOG. The proposed production increase will not require any additional factory footprint or production infrastructure.

Location
Sassafras (locality centre; the EPA names the locality, not the site), Tasmania-41.3215, 146.5400
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 8 Oct 2015
  3. ApprovedNow
  • EPA assessment, 7216 Bass Highway, Sassafras 7307 (Class 2B)Tasmania · Board of the EPA Tasmania
    8 Oct 2015 → 6 Aug 20204 years 9 months
    Assessment completed↗
  • EPA assessment, Parramattah Creek Processing Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    12 Jan 2024 → pending2 years 10 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Bass Highway targeted upgrades between Deloraine and DevonportIn planning · $50m4 km
  2. Sassafras - Wesley Vale Irrigation Scheme AugmentationIn assessment10 km
  3. Alternate Fuels Project, Railton Cement WorksApproved11 km
  4. Dulverton Organics Recycling Facility, RailtonApproved11 km
  5. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment12 km
  6. Long Hill Quarry, Elizabeth TownIn assessment12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.