Parramatta Creek Fish Processing Facility, Sassafras
Manufacturing · Sassafras · Tasmania
- To a 132 kV line
- 1 km
Overview
Huon Aquaculture Company Pty Ltd is currently operating under approval (EPA file reference 244900) as a fish processing facility located approximately 25 km southeast of Devonport. The proposal seeks to increase the current approved annual production of 33,000 tonnes per annum of head-on-gutted (HOG) fish products to 48,000 tonnes per annum of HOG. The proposed production increase will not require any additional factory footprint or production infrastructure.
- Location
- Sassafras (locality centre; the EPA names the locality, not the site), Tasmania-41.3215, 146.5400
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 1 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 8 Oct 2015
- ApprovedNow
- Construction
- Operating
- EPA assessment, 7216 Bass Highway, Sassafras 7307 (Class 2B)Tasmania · Board of the EPA Tasmania8 Oct 2015 → 6 Aug 20204 years 9 monthsAssessment completed↗
- EPA assessment, Parramattah Creek Processing Facility (Class 2B)Tasmania · Board of the EPA Tasmania12 Jan 2024 → pending2 years 10 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Bass Highway targeted upgrades between Deloraine and DevonportIn planning · $50m4 km
- Sassafras - Wesley Vale Irrigation Scheme AugmentationIn assessment10 km
- Alternate Fuels Project, Railton Cement WorksApproved11 km
- Dulverton Organics Recycling Facility, RailtonApproved11 km
- Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment12 km
- Long Hill Quarry, Elizabeth TownIn assessment12 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.