In assessmentNo EPBC referral

Northdown Quarry, Northdown

Quarries and extractive · Northdown · Tasmania

To a 132 kV line
18 km

Overview

Carter Contracting is proposing to intensify operations at the Northdown Gravel Quarry, located off Port Sorell Road, approximately 2.5 kilometres west of Port Sorell. The proposal involves an increase in extraction from 5,000 cubic metres to 7,500 cubic metres of gravel per year and includes an increase in materials handling (screening) from 1,000 cubic metres to 7,500 cubic metres of gravel per year.

Location
Northdown (locality centre; the EPA names the locality, not the site), Tasmania-41.1555, 146.4930
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
18 km to a 220 kV line. 25 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 8 Apr 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Northdown QuarryTasmania · Board of the EPA Tasmania
    8 Apr 2026 → pending7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Motorcycle Training and Racing TrackIn planning3 km
  2. Hydrogen Tasmania North, Wesley ValeIn assessment7 km
  3. Devonport East Terminal 3 Dredging and Reclaim Project, East DevonportApproved9 km
  4. Sassafras - Wesley Vale Irrigation Scheme AugmentationIn assessment10 km
  5. Latrobe LeveeIn assessment11 km
  6. Landfill Modernisation Project, Dulverton Regional Landfill, LatrobeIn assessment11 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.