Bobadil Tailing Storage Facility Stage 11 and Stage 12 Embankment Raise, Rosebery

Mining · Rosebery · Tasmania

To a 132 kV line
3.3 km

Overview

The Bobadil tailings storage facility (TSF) is located approximately 1.7 km northwest of Rosebery. Bobadil TSF receives and stores tailings from MMG’s Rosebery mine, which produces zinc, copper and lead concentrates and gold doré via underground mining and processing. The proposal is to raise the embankment wall of the Bobadil TSF by 2 m, to a final crest elevation of RL 203 m, using ‘upstream’ construction techniques (meaning the embankment raise will occur within the existing TSF footprint). The existing emergency spillway will be developed to meet the increased height of the embankment.

Location
Rosebery (locality centre; the EPA names the locality, not the site), Tasmania-41.7935, 145.5100
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3.3 km to a 220 kV line. 6.8 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 28 Apr 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Bobadil Tailings Storage Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    28 Apr 2023 → 7 Nov 20241 year 6 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. 2/5 Dam Tailings Storage Facility, RoseberyApproved0.0 km
  2. Bobadil Heights, Filtered Tailings Stack, RoseberyIn assessment0.0 km
  3. Exe Tailings Storage FacilityIn assessment0.8 km
  4. Design and Assessment Works - South Marionoak Tailings Storage Facility Rosebery, TasmaniaApproved3 km
  5. South Marionoak Tailings Storage Facility, RoseberyIn assessment3 km
  6. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-11-07. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.