Bobadil Tailing Storage Facility Stage 11 and Stage 12 Embankment Raise, Rosebery
Mining · Rosebery · Tasmania
- To a 132 kV line
- 3.3 km
Overview
The Bobadil tailings storage facility (TSF) is located approximately 1.7 km northwest of Rosebery. Bobadil TSF receives and stores tailings from MMG’s Rosebery mine, which produces zinc, copper and lead concentrates and gold doré via underground mining and processing. The proposal is to raise the embankment wall of the Bobadil TSF by 2 m, to a final crest elevation of RL 203 m, using ‘upstream’ construction techniques (meaning the embankment raise will occur within the existing TSF footprint). The existing emergency spillway will be developed to meet the increased height of the embankment.
- Location
- Rosebery (locality centre; the EPA names the locality, not the site), Tasmania-41.7935, 145.5100
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 3.3 km to a 220 kV line. 6.8 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 28 Apr 2023
- ApprovedNow
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Bobadil Tailings Storage Facility (Class 2B)Tasmania · Board of the EPA Tasmania28 Apr 2023 → 7 Nov 20241 year 6 monthsAssessment completed↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
Nearby
- 2/5 Dam Tailings Storage Facility, RoseberyApproved0.0 km
- Bobadil Heights, Filtered Tailings Stack, RoseberyIn assessment0.0 km
- Exe Tailings Storage FacilityIn assessment0.8 km
- Design and Assessment Works - South Marionoak Tailings Storage Facility Rosebery, TasmaniaApproved3 km
- South Marionoak Tailings Storage Facility, RoseberyIn assessment3 km
- Non-Acid Forming Aggregate Storage Facility, Renison BellApproved6 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-11-07. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.