2/5 Dam Tailings Storage Facility, Rosebery

Water and wastewater · Rosebery · Tasmania

To a 132 kV line
3.3 km

Overview

The 2/5 Dam Tailing Storage Facility Stage 3 embankment raise proposal is to increase the height of the 2/5 dam by 2 metres to RL 175 metres. This will increase the storage capacity of the tailing’s facility for approximately 18 months. The construction material for the raise will be sourced from new borrow areas located within the mining lease.

Location
Rosebery (locality centre; the EPA names the locality, not the site), Tasmania-41.7935, 145.5100
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3.3 km to a 220 kV line. 6.8 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 5 July 2022
  3. ApprovedNow
  • EPA assessment, Rosebery Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    5 July 2022 → 6 Oct 20264 years 3 months
    Assessment completed↗
  • EPA assessment, Rosebery Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    20 Dec 2022 → pending3 years 11 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Bobadil Tailing Storage Facility Stage 11 and Stage 12 Embankment Raise, RoseberyApproved0.0 km
  2. Bobadil Heights, Filtered Tailings Stack, RoseberyIn assessment0.0 km
  3. Exe Tailings Storage FacilityIn assessment0.8 km
  4. Design and Assessment Works - South Marionoak Tailings Storage Facility Rosebery, TasmaniaApproved3 km
  5. South Marionoak Tailings Storage Facility, RoseberyIn assessment3 km
  6. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.