Skip to content
In assessmentNo EPBC referral

Lonnavale Broodstock RAS and Pre-Smolt Facility, Lonnavale

Water and wastewater · Lonnavale · Tasmania

To a 132 kV line
16 km

Overview

The proposed project is for the development of a new recirculated aquaculture system (RAS) facility to house up to 94.5 tonnes of broodstock for egg production. It will involve: • the installation of a new shed to house three new RAS tank arrays and associated elements • replacement and upgrade of the existing sludge handling and treatment system • upgrade of the existing water offtake infrastructure • upgrade of the existing effluent treatment system, including the construction of a new settlement/storage dam • upgrade of the power supply.

Location
Lonnavale (locality centre; the EPA names the locality, not the site), Tasmania-42.9655, 146.7725
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
16 km to a 220 kV line. 42 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 5 Aug 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Lonnavale Broodstock RAS FacilityTasmania · Board of the EPA Tasmania
    5 Aug 2024 → pending2 years 3 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Eddy Creek Quarry Upgrade, LonnavaleApproved0.0 km
  2. Edgar Dam Strengthening ProjectIn planning21 km
  3. Sawmill and Pyrolysis Facility, HuonvilleApproved24 km
  4. Geeveston Wastewater Treatment Plant, Discharge Relocation, Port HuonApproved25 km
  5. Whale Point Nursery Intensification and Expansion, Port HuonApproved25 km
  6. Catos Hill Quarry Capacity Increase, CradocApproved26 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Invited on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.