Lonnavale Broodstock RAS and Pre-Smolt Facility, Lonnavale
Water and wastewater · Lonnavale · Tasmania
- To a 132 kV line
- 16 km
Overview
The proposed project is for the development of a new recirculated aquaculture system (RAS) facility to house up to 94.5 tonnes of broodstock for egg production. It will involve: • the installation of a new shed to house three new RAS tank arrays and associated elements • replacement and upgrade of the existing sludge handling and treatment system • upgrade of the existing water offtake infrastructure • upgrade of the existing effluent treatment system, including the construction of a new settlement/storage dam • upgrade of the power supply.
- Location
- Lonnavale (locality centre; the EPA names the locality, not the site), Tasmania-42.9655, 146.7725
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 16 km to a 220 kV line. 42 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 5 Aug 2024
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Lonnavale Broodstock RAS FacilityTasmania · Board of the EPA Tasmania5 Aug 2024 → pending2 years 3 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
Nearby
- Eddy Creek Quarry Upgrade, LonnavaleApproved0.0 km
- Edgar Dam Strengthening ProjectIn planning21 km
- Sawmill and Pyrolysis Facility, HuonvilleApproved24 km
- Geeveston Wastewater Treatment Plant, Discharge Relocation, Port HuonApproved25 km
- Whale Point Nursery Intensification and Expansion, Port HuonApproved25 km
- Catos Hill Quarry Capacity Increase, CradocApproved26 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Invited on Case for Assessment. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.