Logie Farm Quarry, Orielton

Quarries and extractive · Richmond · Tasmania

To a 132 kV line
9.4 km

Overview

The proposal is to enable blasting at an existing mining lease for extraction and benching purposes and to increase processing capacity from 5,000m3 to 15,000m3 pa.

Location
Richmond (locality centre; the EPA names the locality, not the site), Tasmania-42.7345, 147.4070
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
9.4 km to a 220 kV line. 11 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 9 May 2024
  3. ApprovedNow
  • EPA assessment, Logie Farm Road Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    9 May 2024 → date not published
    Withdrawn↗
  • EPA assessment, Logie Farm Road Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    7 Nov 2025 → 27 Apr 20265 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Increase in Milk Processing Capacity, RichmondIn assessment0.0 km
  2. Cherries Tasmania Composting, Old BeachIn assessment9 km
  3. Tasman Highway Upgrade ��� Hobart Airport to Sorell CausewayIn assessment12 km
  4. Flagstaff Gully Quarry, LindisfarneIn assessment13 km
  5. Midway Point Causeway (including McGees Bridge) and Sorell CausewayIn planning · $187m13 km
  6. Duplication of Midway Point and Sorell CausewaysIn assessment13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-04-27. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.