Cherries Tasmania Composting, Old Beach

Waste and recycling · Old Beach · Tasmania

To a 132 kV line
0.9 km

Overview

Carteman Pty Ltd trading as Cherries Tasmania Orchards is proposing to intensify and upgrade an existing composting operation associated with the Cherries Tasmania Orchard located in Old Beach. The proposal seeks to increase the maximum production limit to 3,750 cubic metres of compost material per year and sell compost product to external third parties.

Location
Old Beach (locality centre; the EPA names the locality, not the site), Tasmania-42.7595, 147.3005
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.9 km to a 220 kV line. 8.3 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 26 Aug 2021

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Cherries Tasmania Composting, 647 Baskerville Road, Old Beach 7017 (Class 2A)Tasmania · Board of the EPA Tasmania
    26 Aug 2021 → pending5 years 2 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Vegetation clearing for residential subdivisionIn planning6 km
  2. New Bridgewater BridgeUnder construction · $786m6 km
  3. Metal Recycling Facility, BridgewaterApproved7 km
  4. Tyre Recycling Facility Upgrade, BridgewaterApproved7 km
  5. Boral Bridgewater Quarry, Material Recycling Facility, BridgewaterIn assessment7 km
  6. Bullock Recycling Services Relocation, BridgewaterIn assessment7 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.