Flagstaff Gully Quarry, Lindisfarne

Quarries and extractive · Lindisfarne · Tasmania

Changed 22 November 2026: State approval: In assessment to Withdrawn. All changes

To a 132 kV line
2.5 km

Overview

Heidelberg Materials Australia Pty Ltd is proposing to increase production at the existing level 2 Flagstaff Gully Quarry, located at 243 & 395 Flagstaff Gully Road, Lindisfarne.

Location
Lindisfarne (locality centre; the EPA names the locality, not the site), Tasmania-42.8435, 147.3640
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.5 km to a 220 kV line. 2.4 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentNowLodged 5 Aug 2020
  • EPA assessment, Flagstaff Gully Quarry, Flagstaff Gully Road, Lindisfarne 7018 (Class 2B)Tasmania · Board of the EPA Tasmania
    5 Aug 2020 → date not published
    Withdrawn↗
  • EPA assessment, Flagstaff Gully Quarry, Lindisfarne (Class 2B)Tasmania · Board of the EPA Tasmania
    30 Jan 2026 → pending9 months so far
    In assessment↗

Recent changes

Recorded since October 2026 · RSS feed
  1. State approval: In assessment to Withdrawn.Approval

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Rosny Hill Lookout and HotelApproved3 km
  2. Tasman Bridge UpgradeIn planning · $130m3 km
  3. Mornington Roundabout UpgradeIn planning · $100m3 km
  4. Expansion and Upgrade of Hydrowater Treatment Facility, MorningtonApproved3 km
  5. Selfs Point Sewage Treatment Plant and Wastewater PipelineIn planning3 km
  6. Macquarie Point Sewage Pump Station and Rising MainIn planning4 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.