Lilla Villa Quarry Expansion, Bicheno

Road · Bicheno · Tasmania

To a 132 kV line
102 km

Overview

Wallaroo Contracting Pty Ltd, is proposing a production increase and expansion to the existing quarry off the Tasman Highway close to Bicheno. The proposal is for an increase in extraction and processing from 40 000 cubic metres to 100 000 cubic metres.

Location
Bicheno (locality centre; the EPA names the locality, not the site), Tasmania-41.9055, 148.2530
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
102 km to a 220 kV line. 106 km to Palmerston substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 8 July 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Lilla Villa Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    8 July 2024 → 8 Dec 20251 year 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Bicheno Wastewater Treatment Plant and Recycled Water Scheme Expansion ProjectApproved0.0 km
  2. Greenlawn Quarry Expansion, BichenoIn assessment0.0 km
  3. Cullenswood Mine development of open cut coal pit No. 6In planning33 km
  4. Pit Extension and Rehabilitation, Cullenswood No.2, St MarysIn assessment36 km
  5. Blackwood 6 Portal Development, Blackwood CollieryIn assessment40 km
  6. Blackwood 1 Redevelopment, Blackwood Colliery, CornwallIn assessment40 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-12-08. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.