Bicheno Wastewater Treatment Plant and Recycled Water Scheme Expansion Project

Waste and recycling · Bicheno · Tasmania

To a 132 kV line
102 km

Overview

The proposal is to continue to operate the existing Bicheno Sewage Treatment Plant and existing effluent recycled water scheme at the Bicheno Golf Club, and to expand the wastewater reuse scheme to other nearby properties, with the aim of significantly reducing discharges to the Old Mines Lagoons.

Location
Bicheno (locality centre; the EPA names the locality, not the site), Tasmania-41.9055, 148.2530
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
102 km to a 220 kV line. 106 km to Palmerston substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 8 July 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Bicheno Wastewater Treatment Plant (Class 2B)Tasmania · Board of the EPA Tasmania
    8 July 2022 → 3 June 20241 year 10 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Greenlawn Quarry Expansion, BichenoIn assessment0.0 km
  2. Lilla Villa Quarry Expansion, BichenoApproved0.0 km
  3. Cullenswood Mine development of open cut coal pit No. 6In planning33 km
  4. Pit Extension and Rehabilitation, Cullenswood No.2, St MarysIn assessment36 km
  5. Blackwood 6 Portal Development, Blackwood CollieryIn assessment40 km
  6. Blackwood 1 Redevelopment, Blackwood Colliery, CornwallIn assessment40 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-06-03. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.