Greenlawn Quarry Expansion, Bicheno

Quarries and extractive · Bicheno · Tasmania

To a 132 kV line
102 km

Overview

Wallaroo Contracting Pty Ltd is proposing an expansion of their Greenlawn Quarry located approximately 6.5 km southwest of Bicheno. The proposal includes a 2.3 hectare expansion across predominately pasture land and a small area of native vegetation and an increase in extraction and processing limits from 10 000 cubic metres per annum to 20 000 cubic metres per annum.

Location
Bicheno (locality centre; the EPA names the locality, not the site), Tasmania-41.9055, 148.2530
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
102 km to a 220 kV line. 106 km to Palmerston substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 8 July 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Greenlawn Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    8 July 2024 → pending2 years 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Bicheno Wastewater Treatment Plant and Recycled Water Scheme Expansion ProjectApproved0.0 km
  2. Lilla Villa Quarry Expansion, BichenoApproved0.0 km
  3. Cullenswood Mine development of open cut coal pit No. 6In planning33 km
  4. Pit Extension and Rehabilitation, Cullenswood No.2, St MarysIn assessment36 km
  5. Blackwood 6 Portal Development, Blackwood CollieryIn assessment40 km
  6. Blackwood 1 Redevelopment, Blackwood Colliery, CornwallIn assessment40 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.