Koolunga BESS
Batteries and pumped hydro · Koolunga · South Australia
- Capacity
- 200 MW
- To a 132 kV line
- 3.1 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 200 MW (4 hour) battery.
- Location
- Koolunga (town centre; the tender results do not give the site), South Australia-33.5496, 138.3323
- Value
- Not published
- Technology
- Battery, 200 MW, with 800 MWh of storage
- Owner
- Equis
- Distance to the grid
- 3.1 km to a 132 kV line. 3.1 km to 275 kV. 8.5 km to Red Hill substation (132 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 200 MW, 800 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and SA maps…
Who's involved
- EquisOwner
Nearby
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.