Skip to content
In planningNo EPBC referral

Koolunga BESS

Batteries and pumped hydro · Koolunga · South Australia

Capacity
200 MW
To a 132 kV line
3.1 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 200 MW (4 hour) battery.

Location
Koolunga (town centre; the tender results do not give the site), South Australia-33.5496, 138.3323
Value
Not published
Technology
Battery, 200 MW, with 800 MWh of storage
Owner
Equis
Distance to the grid
3.1 km to a 132 kV line. 3.1 km to 275 kV. 8.5 km to Red Hill substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 200 MW, 800 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and SA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Clements Gap BESSIn planning26 km
  2. Morgan Whyalla Pipeline No.1 Renewal – Stage 1Approved45 km
  3. Bungama SolarOperating46 km
  4. Hallett BESSIn planning54 km
  5. Whyte Yarcowie Wind FarmIn assessment57 km
  6. Goyder South Hybrid Renewable Energy Facility - Wind Farm 1A, 10km south BurraApproved62 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in SA, and the firms you follow, in the Monday briefing.